Foundation 2/4
  1. Formwork
  2. Pipework
  3. Reinforcement
  4. Pouring concrete

Automatically translated from Dutch by AI. Read the original

Pipework

Sewer, water and electrics in the ground

Preparations

Connections

The formwork was ready; it was time for the building’s water, electrics and drainage. I wanted to take the opportunity to run electrics/water to the garden and lay ducts for internet and unforeseen future needs. This should be the last time the ground has to be opened up for anything. In 8 years it has already been dug up twice before, for a hob and for solar panels.

Advice

For advice on this subject I didn’t have to look far: my father is an electrician and half a plumber. I told him roughly which equipment will go into the garden office (air conditioning, mechanical ventilation, no central heating, computers/servers, pool pump). When he first started talking about a separate cupboard for it, I initially wanted to fit it into a kitchen cabinet to tuck it away somewhere. That wasn’t an option, and we also considered moving the technical cupboard to the garage. In the end we chose to use a small wall by the kitchen unit. We also thought it would be handy to run the garden’s electrics/water/ducting via the garden office. So water/electrics/ducting come up and go straight back into the ground towards the garden. That way you can use the garden office’s consumer unit, and a main stopcock for the garden is much closer too.

Drainage:

  • Toilet - 110mm with an 87-degree bend upwards
  • Kitchen - 40mm vertical - 50mm horizontal

Calculating locations

For the locations of the sewer, water and electrics I started measuring from the wall and looked up standard dimensions for toilets and kitchen units. I did measure our current kitchen and toilet and compared them with how the space feels. For the toilet, for example, I went a bit wider because I find 90 centimetres very cramped. With these dimensions and those of the air cavity, outer walls and inner walls, I calculated the locations. It can always be adjusted a bit, because water is easy to move within the wall; the drainage is a bit trickier.

Buying bends

This is where things went a bit wrong in my head. Somewhere I’d picked up the idea that I had to leave the building roughly parallel to the garage. At Hornbach I could only find 45- and 30-degree bends, and that wasn’t going to work. After a lot of mental contortions and puzzling, I happened to have my friend and landscape gardener on the phone, and he said: ‘just go out of the building in a straight line, then you also have the fewest connections in the concrete and less can go wrong. Oh, and for everything else you can find almost any bend, and push-fit joints are easier’. Well, that made it a lot simpler straight away!

An 87-degree bend upwards, horizontally a 110mm pipe with a Y-piece in between branching to 50mm for the kitchen drain. For the kitchen another bend upwards and a reducer to 40mm, and we’re ready for the foundation.

Digging and bends

I laid all the connections in trenches with another 15-20 cm of soil on top. The sewer slightly deeper and to a fall of 1 cm per metre. I think that took me a good afternoon. For the fall of 1 cm per metre, I’d checked on my spirit level how far that was off level, and measured it that way.

I did my shopping at Hornbach (really by far the cheapest for this) and had to make do with push-fit joints, but also a glued joint for the 50mm bend. At 5 pm on a Sunday I was busy with the push-fit joint, had done something wrong and the joint had to come off. With a big dollop of Vaseline it had slid on in no time, but getting it off seemed utterly impossible. Greasy hands, a towel getting ever greasier from the Vaseline, and attempt after attempt. Hornbach closed, so no way back. In the end it popped off, but what a stress that was! If you do everything right first time it works brilliantly, I thought to myself.

Pipes through the foundation laid to a fall and running under the frost footing in the sand
All connections brought up and capped